There’s Gold In Them Hills!

The Right Time for an Informed Investor!

 CALIFORNIA GOLD MINE “ For Sale “

         ___Cherry Hill Mine___

 

The Cherry Hill Mine: Established in 1892, a formerly producing, small underground  high-grade gold mine. One of the benefits of purchasing a past-producing mine is that the cost of moving into production is much lower than the cost of bringing a mine from the exploration phase to the production phase.

 

Location: When thinking of mines you tend to visualize a hard-to-reach, remote, backcountry hillsides that require vast amounts of money to ensure adequate infrastructure. That isn’t the case with Cherry Hill. Because Cherry Hill is a formerly producing mine, all the infrastructure is already there. That means you have a leg up on some of the costs involved with getting the mine up and running. The mine is just a short ride from the town of Yreka, California, down a state-operated, paved road that turns into a well-maintained gravel road. It's easy to get to and has great access to the I-5, a major artery running north-south along the West Coast. It also means that when you do ramp up production, the heavy-duty trucks won't have much of an issue getting the ore from the mine to the mill.

 

Historical Geological Reports: 1892 0.97 oz Au/ton with Ore running at 

$20.00 Au/ton (Yreka Journal, 11/16/1892). In 1892 100 tons 

milled by Selby avg. $61.00/ton (3oz Au equivalent/ton) (Yreka Journal 12/7/1892). On July 24th 1900 the mill run produced $5,300. (254.4 oz Au; 10.7 oz/day; 10 tons/day at 1 oz Au/ton Mining and Scientific Press 7/14/1900). 2003 Core Drilling produced 25' of 1.024 oz Au/ton - 30' of 4.758 oz Au/ton and 39.5 oz Ag/ton. Historical Resource Estimate by R. L Hill, CA Reg.Geologist #3386, Jan 5, 2009.

Primary Target - Queen Vein WQ #3 and WQ #4 levels at 8889 yrds³ = 20,000 short tons at 1 opt at $1200 worth $24,000,000.

 

Level 2 - WQ #4 to Camp Level at 9778 yrds³ = 22,000 short tons at 1 opt at $1,200 worth 

$26,400,000. Camp Level to Long Tunnel Adit approx 300,000 oz...previous owner estimation.

42,000 tons blocked out - based on established mine plan. 43-101 independent Technical Report completed May 22nd, 2012. Between 2011 - 2013 approx $2.6 million spent on exploration and development mining (all figures verified by audit).

 

Core Assets

Mining equipment:

50T/ day Ball Mill, Mucker, 7-jackleg drills & diamond drill bits, Loci, 5- Ore bins, Rail track, Bull Dozer, Dump Truck, 2- Generators and Air Fans, Genset Engine, Saw Mill, Dodge Truck & Cargo Trailer, Ford Pickup & Plow, ATV

 

Low cost producer - estimated cost per oz Au at $400.

Metallurgy testing (Norris Labs of Montana) indicates 95% recoveries for 

gold and 87% for silver. 80% of recoverable ore from gravity. Eight known adits on 7 unpatented lode claims situated on 94.6 Acres. Multiple assays completed with underground surveys. Defining a resource is a big expense for exploration companies, costing millions of dollars to complete. In purchasing a previously producing mine, You will have forgone the costly resource definition process because, “this was all done, we know what's here, so just go mine it!”

          

Price $1,295,000 - Will consider all reasonable offers or JV Opportunity

 

For the opportunity to discuss the mines in further detail, please contact:   

Philip Physioc  psp112005@yahoo.com  or  (702) 822-0237      

YouTube Video Link:

Got Questions?

We're at your service:

 

Unique Opportunity Investments

5510 S. Fort Apache #14

Las Vegas, Nevada 89148

 

Phone: 702-822-0237

Fax:     702-562-1261